S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
286. The authorization holder must, except for a well whose risk potential has been classified as low under Schedule 3, draw out the polished drill-stem from the well if it is connected to a pumpjack.
O.C. 1252-2018, s. 286.
In force: 2018-09-20
286. The authorization holder must, except for a well whose risk potential has been classified as low under Schedule 3, draw out the polished drill-stem from the well if it is connected to a pumpjack.
O.C. 1252-2018, s. 286.